Southbound on I-35E at the first advance guide sign
for I-694 East, about 1/2 mile north of County Road E. Photo by Don Greiskalns, taken March
12, 2006. |
 |
The 1/2 mile advance guide sign for the
I-694 East exit, with the County Road E overpass overhead. The
County Road E bridge was rebuilt large enough to accommodate additional
lanes on I-35E, and this location will mark the start of southbound
reconstruction as part of "Unweave the Weave". Photo by Don Greiskalns, taken March
12, 2006. |
 |
The southbound exit to I-694 East.
This ramp will also be moved to a right-side exit as part of "Unweave
the Weave". Photo by Don Greiskalns, taken March 12, 2006. |
 |
Eastbound I-694 at the CSAH 49/Rice St overpass.
This general location marks the western extent of the upcoming "Unweave the
Weave" project. Photo by Don Greiskalns, taken March 4, 2006. |
 |
Guide signage approaching the exit to
I-35E South and the start of the 35E/694 duplex. Photo by Don
Greiskalns, taken March 4, 2006. |
 |
Eastbound at the I-35E South exit. US 10 gets
"handed off" from I-694 onto I-35E here. On the left are cranes already
working on what will be the future NB 35E to WB 694 ramp. Photo by Don
Greiskalns, taken March 4, 2006. |
 |
Eastbound I-694 underneath southbound I-35E.
The lane drop ahead is just one of many geometric problems with the 35E/694
duplex that the "Unweave the Weave" project will fix. Photo by Don
Greiskalns, taken March 4, 2006. |
 |
Overhead signage for the NB/EB I-35E/694 split.
The Edgerton St overpass is in the far background. Photo by Don Greiskalns,
taken March 4, 2006. |
 |
Eastbound at the I-35E/694 split. The
construction in the background is working on what will be future westbound
I-694. Photo by Don Greiskalns, taken March 4, 2006. |
 |
This left-side on-ramp is from southbound I-35E to
eastbound I-694. The "Unweave the Weave" project will move this onramp to
the righthand side. Photo by Don Greiskalns, taken March 4, 2006. |