Northwest Metro

This page covers I-494 from I-394/US 12 in Minnetonka to I-94/694 in Maple Grove.  Total length of this section is approximately 8.5 miles.

Description

Another relatively old section of the I-494/694 beltway, this section was opened in the late-1960s.  Although going through what is now a built-up part of Plymouth, this section of I-494 still feels rather rural in nature, although the traffic belies that feeling.  A high-voltage power line parallels I-494 along much of this segment.  This segment used to have some of the most spaced out interchanges along the I-494/694 beltway, with the original interchanges being at US 12, MN 55, Rockford Rd, and Bass Lake Rd.  The Carlson Parkway interchange was added in the mid-1980s, and assisted in detours during construction of I-394.  Later on, during the early-1990s, Hennepin County built an interchange at CSAH 6, which wound up being a combination of projects.  Besides the interchange, there were improvements to nearby sections of CSAH 6, culvert and pavement replacement along I-494, and a 3rd lane each direction was added between Carlson Parkway and MN 55.  That project plus a minor improvement under the Carlson Pkwy overpass has brought this stretch of I-494 to its present configuration.

Roadway Configuration

Average Daily Traffic Counts

Location 1980 1982 1984 1986 1988 1990 1992 1994
North of I-394/US 12 35,300 34,700 39,500 47,000 48,000 54,000 66,000 78,000
North of Carlson Pkwy N/A N/A N/A 45,500 47,900 54,000 66,000 70,000
North of CSAH 6 N/A N/A N/A N/A N/A N/A N/A 72,000
North of MN 55 35,600 32,600 39,000 39,100 47,500 52,000 52,000 69,000
North of Rockford Rd 34,500 30,500 36,500 39,700 46,100 51,000 60,000 67,000
North of Bass Lake Rd 27,800 28,500 34,000 40,600 48,200 49,500 57,000 65,000
494 N to 94 W ramps 9,900 14,900 15,800 15,700 26,750 26,500 28,500 33,500

 

Location 1996 1998 2000 2002 2004 2006 10-yr
'96-'06
Change
North of I-394/US 12 86,000 96,000 105,000 98,000 97,000 105,000 +22%
North of Carlson Pkwy 88,000 95,000 105,000 101,000 109,000 103,000 +17%
North of CSAH 6 82,000 88,000 94,000 92,000 93,000 91,000 +11%
North of MN 55 81,000 79,000 81,000 80,000 80,000 90,000 +11%
North of Rockford Rd 72,000 77,000 78,000 79,000 79,000 81,000 +13%
North of Bass Lake Rd 70,000 75,000 77,000 74,000 76,000 79,000 +13%
494 N to 94 W ramps 36,500 N/A N/A N/A N/A N/A N/A

Carlson Pkwy interchange opened after 1984.
CSAH 6 interchange opened after 1992.

Click HERE for the Exit List

Speed Limit

History

Future Plans

Froggie Suggests

Links

Last updated 12 May, 2008