This page covers I-494 from I-394/US 12 in Minnetonka to I-94/694 in Maple Grove. Total length of this section is approximately 8.5 miles.
Description
Another relatively old section of the I-494/694 beltway, this section was opened in the late-1960s. Although going through what is now a built-up part of Plymouth, this section of I-494 still feels rather rural in nature, although the traffic belies that feeling. A high-voltage power line parallels I-494 along much of this segment. This segment used to have some of the most spaced out interchanges along the I-494/694 beltway, with the original interchanges being at US 12, MN 55, Rockford Rd, and Bass Lake Rd. The Carlson Parkway interchange was added in the mid-1980s, and assisted in detours during construction of I-394. Later on, during the early-1990s, Hennepin County built an interchange at CSAH 6, which wound up being a combination of projects. Besides the interchange, there were improvements to nearby sections of CSAH 6, culvert and pavement replacement along I-494, and a 3rd lane each direction was added between Carlson Parkway and MN 55. That project plus a minor improvement under the Carlson Pkwy overpass has brought this stretch of I-494 to its present configuration.
Roadway Configuration
6 lanes between I-394 and MN 55
4 lanes north of MN 55
Average Daily Traffic Counts
Location | 1980 | 1982 | 1984 | 1986 | 1988 | 1990 | 1992 | 1994 |
North of I-394/US 12 | 35,300 | 34,700 | 39,500 | 47,000 | 48,000 | 54,000 | 66,000 | 78,000 |
North of Carlson Pkwy | N/A | N/A | N/A | 45,500 | 47,900 | 54,000 | 66,000 | 70,000 |
North of CSAH 6 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | 72,000 |
North of MN 55 | 35,600 | 32,600 | 39,000 | 39,100 | 47,500 | 52,000 | 52,000 | 69,000 |
North of Rockford Rd | 34,500 | 30,500 | 36,500 | 39,700 | 46,100 | 51,000 | 60,000 | 67,000 |
North of Bass Lake Rd | 27,800 | 28,500 | 34,000 | 40,600 | 48,200 | 49,500 | 57,000 | 65,000 |
494 N to 94 W ramps | 9,900 | 14,900 | 15,800 | 15,700 | 26,750 | 26,500 | 28,500 | 33,500 |
Location | 1996 | 1998 | 2000 | 2002 | 2004 | 2006 | 10-yr '96-'06 Change |
North of I-394/US 12 | 86,000 | 96,000 | 105,000 | 98,000 | 97,000 | 105,000 | +22% |
North of Carlson Pkwy | 88,000 | 95,000 | 105,000 | 101,000 | 109,000 | 103,000 | +17% |
North of CSAH 6 | 82,000 | 88,000 | 94,000 | 92,000 | 93,000 | 91,000 | +11% |
North of MN 55 | 81,000 | 79,000 | 81,000 | 80,000 | 80,000 | 90,000 | +11% |
North of Rockford Rd | 72,000 | 77,000 | 78,000 | 79,000 | 79,000 | 81,000 | +13% |
North of Bass Lake Rd | 70,000 | 75,000 | 77,000 | 74,000 | 76,000 | 79,000 | +13% |
494 N to 94 W ramps | 36,500 | N/A | N/A | N/A | N/A | N/A | N/A |
Carlson Pkwy interchange opened after 1984.
CSAH 6 interchange opened after 1992.