This was an old idea for a 3-line LRT system that I created back in 2000, prior to construction on the Hiawatha LRT line. The three lines I proposed that time were an I-35W line from downtown to Burnsville Center, a modified version of the real-life proposed Central LRT line (modified to follow I-94 from the U of M east, and extend east of downtown St. Paul to the 3M Headquarters), and a "Bloomington Strip" line generally along I-494 between Eden Prairie Center and the airport.
Froggie's LRT System Map (v1.0)
Back to the main "Version 3.0" page
Back to Froggie's Minnesota Opinion Pages
Back to Twin Cites Highways
Page last modified 06 January, 2008